Friday, February 17, 2012

Update 2-17-12





I haven’t posted in a while, and I’m sorry for those of you who check in on a daily basis. Things have been happening but at a little bit slower pace or maybe it’s just that the projects are a little smaller. We had the hard wood laminate installed in the entry way and to make everything match nicely they tore out the old flooring in the dining room and kitchen and put new laminate in there as well. So I had to get out of the house for the day so I wouldn’t be in the way. H&B Electric came out and did some finish electrical work. The trim guys put the interior doors in and trimmed everything and built the closet organizer. Joe Hess set the shower pan, which is a very involved process. Then Joe and Steve Adkins put the heated floor down so the tile can be put down on top of it. Steve got the floor tile down and is working on the shower tile now. The granite counter top was donated and installed today in the bathroom by Wall to Wall Tile & Stone. From the sounds of it on Monday the painters will finish up the painting and then on Tuesday the carpet will be installed. Of course we will have to wait to see if all goes as planned. This has been a very fast addition project but we are more than ready to move out of the dining room.

No comments:

Post a Comment